Requirements Before Installing Anti-static Flooring

Dec 08, 2025

Leave a message

(1) Preparation of the installation site. The specific requirements for the installation site are as follows:
The flooring should be installed after the completion of interior civil engineering and decoration work; the ground should be flat, dry, free of debris and dust; the space under the floor for laying cables, circuits, water pipes, air pipes, and air conditioning systems should be completed before floor installation; the foundation for large and heavy equipment should be completed, and the equipment should be installed on the foundation, with the foundation height matching the finished height of the floor surface; a 220V/50Hz power supply and water source should be available at the construction site.


(2) Preparation of flooring installation tools. The specific tools include the following:
a. Marble cutting saw, power drill, hammer, hand grinder;
b. Laser level, network laser scanner;
c. Bubble level, tape measure, chalk line;
d. Suction cup lifter, nut adjustment wrench, Phillips screwdriver;
e. Vacuum cleaner, broom, mop;


(3) The installation of anti-static raised flooring in the computer room is the final stage of building decoration. It should be carried out after the ceiling panels are installed and the ceiling lights and ventilation outlets are also installed. The ground should be cleaned before installing the raised flooring (if there is insulation cotton and cable trays, the insulation cotton and cable trays should be installed first).